Contract Type | Engineering, Procurement & Construction |
Location | Yazd, Iran |
Executive stage | Final Handover |
Physical Progress | 100% |
Commencement Date | Oct., 5, 2003 |
Initial Duration | 29 months |
General works’ Quantity | |
Earth works | 140,000 m³ |
concreting | 15,000 m³ |
Reinforcement | 1,500 tons |
Metal works | 1,200 tons |
Brief Description & Technical Specification
Yazd Combined Cycle Powerplant has a capacity of 132 Megawatts. The project contract includes 2 phases as followed; The first phase consists of the works which was provided their design documents for BolandPayeh as an executive contractor. The second phase consists of the engineering, procurement and construction works which was assigned to BolandPayeh as the General Contractor. The EPC phase included civil works and installation of HVAC, firefighting, cranes and lifting lights, telephone, lighting, grounding and lightning systems.