Contract Type | Construction |
Location | Arak, Iran |
Executive stage | Final Handover |
Physical Progress | 100% |
Commencement Date | Jul., 11, 1995 |
Initial Duration | 30 months |
General works’ Quantity | |
Earth works | 500,000 m³ |
concreting | 55,000 m³ |
Reinforcement | 10,000 ton |
Sliding formwork | 250,000 m² |
Metal works | 2,500 tons |
Brief Description & Technical Specification
Shazand powerplant was implemented on a land with an area of 240 hectares. The powerplant has 4 steam units with a total capacity of 1,300 megawatts. BolandPayeh scope of work in this project is to construct 4 cooling towers of the plant. The cooling towers have a hyperbolic shape in transverse section with 130 meters high. The horizontal circular cross-section of the towers starts with a diameter of 110 meters and end with a diameter of 60 meters. The cooling towers have been designed and implemented using sliding formwork system.