IKA Passenger’s Terminal Development
Contract Type Engineering, Procurement & Construction
Location Tehran, Iran
Executive stage Final Handover
Physical Progress 100%
Commencement Date Jul., 5, 2009
Initial Duration 24 months
General works’ Quantity
Earth works 20,000 m³
concreting 9,000 m³
Reinforcement 1,200 tons
Form working 30,000 m²
Metal works 1,000 tons

 

Brief Description

Development of Imam Khomeini International Airport is proposed to double the capacity of passengers’ transportation with an EPC contract. In addition, the costume service, administration and cargo area has been increased by 70 % of its initial situation.

 

Technical Specifications

The development works with the area of 22,000 square meters including: Adding two pier structures at the right and left side of the existing plan. Development of administration and costume building at the right and left side of the existing plan. Adding recreational and food court area to the down side of the existing plan. Disassembly and Re-assembly of the complex existing facade due to the development works.