Gotvand Bridge

status:

is finished

contract type:

epc

project domain:

transportation

location:

Iran , Khouzestan

Gotvand Bridge
Contract Type Engineering, Procurement & Construction
Location Gotvand-Shoushtar, Iran
Executive stage Final Handover
Physical Progress 100%
Commencement Date May., 21, 2005
Initial Duration 24 Months
General works’ Quantity
Earth works 22,000 m³
concreting 5,000 m³
Reinforcement 500 tons
Form working 1,500 m²
Pile works 1,000 m³
Post Tensioned Cable 200 tons

 

Brief Description & Technical Specifications

The subject of this contract is engineering, procurement and construction of the downstream bridge of the Gotvand Dam on Karoun River. The length of the bridge is 260 meters and its width is 12 meters. The concrete structure has an exposed face, which is constructed with special formwork system.