Flood Arrangement System of Asalouyeh Sit

status:

is finished

contract type:

c

project domain:

water

location:

Iran , Bushehr

Flood Arrangement System of Asalouyeh Sit
Contract Type Construction
Location Asalouyeh, Iran
Executive stage Final Hanover
Physical Progress 100%
Commencement Date Jun., 19, 2006
Initial Duration 21 months
General works’ Quantity
Earth works 600,000 m³
concreting 60,000 m³
Reinforcement 5,500 tons
Metal works 130,000 m²

 

Brief Description & Technical Specification

The project has been developed with the aim of collecting and drain the runoff flow originated from the flood in case of heavy rain in the refinery fields of Asalouyeh. The collected water would be conducted to the Persian Gulf. BolandPayeh service in this project is to construct three lines of conducting channel with a length of 8.7 kilometers, which includes the reinforced concrete bottom slab and walls.