_20241229112526.357.jpg)
Contract Type | Construction |
Location | Asalouyeh, Iran |
Executive stage | Final Hanover |
Physical Progress | 100% |
Commencement Date | Jun., 19, 2006 |
Initial Duration | 21 months |
General works’ Quantity | |
Earth works | 600,000 m³ |
concreting | 60,000 m³ |
Reinforcement | 5,500 tons |
Metal works | 130,000 m² |
Brief Description & Technical Specification
The project has been developed with the aim of collecting and drain the runoff flow originated from the flood in case of heavy rain in the refinery fields of Asalouyeh. The collected water would be conducted to the Persian Gulf. BolandPayeh service in this project is to construct three lines of conducting channel with a length of 8.7 kilometers, which includes the reinforced concrete bottom slab and walls.